Wind power in Montana is a growing industry. At a nameplate capacity of 210 megawatts (MW),〔〔 〕 the $500 million〔〔(【引用サイトリンク】title=NaturEner shows off $500 million Glacier Wind farm )〕 Glacier Wind Farm, which is located in Toole and Glacier counties,〔 became Montana's largest in October 2009,〔 〕 surpassing the 135 MW Judith Gap Wind Farm in Wheatland County.〔 Rim Rock Wind Farm, brought online in September 2012, is located about 25 miles due north of the Glacier project. The wind farm has 126 wind turbines of 1.5 megawatts each, to be supplied by Acciona.〔(Acciona gets contract for nacelles )〕 The project had been delayed due to issues with the Montana-Alberta Tie Line, which connects wind farms in the area to Lethbridge, Alberta.〔(【引用サイトリンク】url=http://cutbankpioneerpress.com/articles/2011/10/13/cut_bank_pioneer_press/news/doc4e94c0cbcf810030986608.txt )〕〔(Rim Rock Wind Farm near Cut Bank hosts welcoming ceremony )〕 Montana added two significant wind projects in 2012. The Gordon Butte Wind Farm, 9 MW, was completed early in the year and the Rim Rock Wind Project, 189 MW, was completed in September. Montana had over 650 MW of wind generation capability at the start of 2015 and a new 240 MW project had been started in Carbon county.〔 ==Installed capacity growth==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Wind power in Montana」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|